Installing the Simple Super Z Upgrade with 4 Start Lead Screw

See the video(s) below for installation instructions on for your Super Z Upgrade.  A few notes before you begin.

 

NOTES: Before You Begin

  • Watch both videos first.
    • The first video is the original installation video was produced for the older Z upgrade, which included a 1/4"-16 acme rod.  Your kit includes 8mm 4-start threaded rod (lead screw).  So, you will need to install the new coupler and Z nut as well.
    • See the second video for instructions on installing the coupler and Z nut.
  • As of 8/11/16, the aluminum handle is no longer included in this upgrade kit.  
  • You will need to send the following commands through your Pronterface UI.  Since you are upgrading to larger build volume and a different pitch of threaded rod, new settings will need to be saved to your Printrboard.
    • M211 Z250
    • M92 Z400
    • M500
    • M501
  • You will also need to make the following adjustments in your Machine Settings in Cura.  
    • Machine/Machine Settings
    • Maximum height (mm) = 250
    • Click "Ok" to save.

Screen_Shot_2017-08-01_at_3.50.21_PM.png

 

 

Have more questions? Submit a request

0 Comments

Please sign in to leave a comment.
Powered by Zendesk